The Haven Infrastructure Works

The Haven Infrastructure Works

  • Total Road Length is 13.50KM
  • Client: Al Dar Development
  • Consultant: Parsons
  • Creating Post BIM Execution Plan “BEP” as per EIR requirements
    at Construction Stage.
  • Extracting SDs & As Built Drawings for Roads and various Utilities
    (Sewerage – Storm Water – Irrigation – Firefighting – GAS – LV&MV Networks).
  • Creating LOD400 & LOD500 Civil 3d & Revit BIM Models.
  • Applying 4D Model parameters & creating InfraWorks Model.

Do you have a project in mind?

Get in touch with the Siriabeam support team and get a free consultation and answers to all your questions