The Wilds Infrastructure Works

The Wilds Infrastructure Works

  • Total Road Length is 16Km.
  • Client: Al Dar Development.
  • Consultant: Parsons.
  • Creating Post BIM Execution Plan “BEP” as per EIR requirements at Construction Stage.

  • Extracting drawings for roads and utilities, both wet and dry, from Shop and as-built perspectives.

  • Creating Lod400 & Lod500 Civil 3d & Revit BIM Models.

  • Applying 4D Model parameters & creating InfraWorks Model.

Do you have a project in mind?

Get in touch with the Siriabeam support team and get a free consultation and answers to all your questions