Olympic Village in France
- باريس - فرنسا
The SBT Tech team performed LOD300 structural modeling of the 12-block-7-storey building.
Coordination with the architectural model made by a French company using BIM Cloud
The SBT Tech team performed LOD300 structural modeling of the 12-block-7-storey building.
Coordination with the architectural model made by a French company using BIM Cloud
Get in touch with the Siriabeam support team and get a free consultation and answers to all your questions